CC Demo 100 penetrates rubble and soil to form a penetrating protective layer over contaminated demolition debris.

CC Demo 100 is applied during the demolition process and at the end of the day as a daily cover to provide “off-shift” stabilization.

Traditional sanitary landfills or construction projects use daily covers for dust suppression, control of VOC’s and fire hazards. Radiological and Beryllium contaminated demolition sites require additional controls.

Demolition requires control of contaminated debris. CC Demo 100 provides these additional controls. The polymer-based liquid seeps down into the rubble and stabilizes unseen surfaces within the pile of contaminated debris. CC Demo also penetrates into contaminated soils and prevents re-suspension during excavation operations.

CC Demo 100 ensures environmental control of contaminated debris.

ArrowArrow
Slider



SDS